Year of Project Project Location Description of Job
2025 SGA Project Phase 6 (Level 1 & 2) Installation of busduct.
2025 Air Trunk Project Installation of busduct.
2025 SGA Project Phase 5 (Level 3 & 4) Installation of busduct.
2024 Sin61 (Phase 8 ) @ Loyang Drive Installation of busduct.
2024 SGA Project Phase 2 (Level 7 & 8) Installation of busduct.
2023-2024 D2017- Seletar Installation of busduct.
2023-2024 PROJECT BUILDING GERAS 2-KG2 Installation of busduct.
2023-2024 Sin61 (Phase 6 ) @ Loyang Drive Installation of busduct.
2023-2024 Sin61 (Phase 7 ) @ Loyang Drive Installation of busduct.
2023 Khoon Engineering Contractor Pte Ltd Installation of busduct.